Importing fabric from India to Europe
The sequence from enquiry to delivered goods, the documents involved, a realistic timeline, and the destination-side costs a CIF price does not include.
Buying fabric from India is not complicated, but it is unfamiliar, and the unfamiliar parts are where first-time importers lose time and money. This page sets out the sequence from enquiry to delivered goods, the documents involved, and a realistic timeline - including the parts most mills leave out because they happen after the fabric stops being the mill’s problem.
One caveat up front, stated plainly: duty rates, VAT treatment and preferential origin arrangements change, and they differ by member state and by commodity code. Nothing on this page is a substitute for your own customs broker. We have flagged where you must get your own confirmation rather than rely on a supplier’s figure.
From enquiry to delivered goods
| Stage | What happens | Indicative time |
|---|---|---|
| 1. Enquiry and quotation | You send composition, GSM, width, weave, finish, colour and quantity. The mill confirms feasibility and quotes FOB and CIF. | 1–3 working days |
| 2. Sampling | Swatches or sample yardage of the proposed construction, couriered. For printed fabric, a strike-off. | 1–2 weeks |
| 3. Lab dip approval | Shade submitted against your standard and approved in writing before bulk. Skipped entirely for greige orders. | 1–2 weeks |
| 4. Order confirmation | Specification, tolerance, inspection standard, Incoterm, payment terms and delivery window agreed in writing. | — |
| 5. Weaving | Production on the water-jet looms, with 4-point inspection on every roll as it comes off. | 2–4 weeks |
| 6. Dyeing and finishing | Where the order is finished rather than greige. Adds shade continuity checks against the approved standard. | 1–3 weeks |
| 7. Pre-shipment and documents | Final inspection, packing, export clearance, document set prepared. | 3–7 days |
| 8. Ocean freight | Hazira, Mundra or Nhava Sheva to your discharge port. | 22–35 days |
| 9. Import clearance | Your broker files the declaration; duty and import VAT paid; goods released. | 2–7 days |
| 10. Inland delivery | Port to your warehouse, arranged by your forwarder. | 1–5 days |
Realistic total for a dyed and finished first order: 8–12 weeks from confirmation to goods in your warehouse. Greige orders skip stages 3 and 6 and run materially faster. Repeat orders of a proven construction skip stages 2 and 3.
The documents, and who produces them
Produced by the mill: commercial invoice, packing list, bill of lading (through the freight forwarder), certificate of origin, and any applicable test and compliance reports - REACH declarations of conformity, OEKO-TEX certification for the specific quality where it exists, restricted-substance test reports for the lot.
Produced or held by you: your EORI number, the import declaration filed by your customs broker, and your own due-diligence records. If your supply chain is subject to corporate sustainability or due-diligence reporting, ask for what you need at enquiry stage rather than after shipment, because some of it has to be generated during production and cannot be reconstructed afterwards.
A note on certification honesty: certification for dyed and finished fabric is usually issued in the finisher’s name rather than the weaver’s, because that is where the chemistry happens. Ask whose name is on the certificate and what its scope covers. A mill that answers that question directly is worth more than one showing a row of logos. Our own certification position is set out in full on the quality page, including what we do not hold.
What a CIF price does not include
A CIF price covers the fabric, packing, inland haulage to the Indian port, export clearance, loading, ocean freight and minimum marine insurance. To get to a landed cost you must add, at your end: destination port and terminal handling charges, customs clearance fees, import duty, import VAT, inland haulage to your warehouse, and any inspection or testing you commission yourself.
Those destination-side costs are frequently a meaningful percentage on top of the CIF figure, which is why comparing an Indian CIF price directly against a European supplier’s delivered price understates the Indian landed cost. Build the full stack before you decide. The comparison usually still favours direct import at volume - but make the decision on the real number, not the invoice number. See FOB vs CIF for how the terms divide those costs.
On duty specifically: woven man-made fibre fabrics into the EU commonly attract a rate in the region of 6.5 to 8 per cent, but the exact figure depends on the CN commodity code for your construction and on current preferential arrangements, which have changed for India over time. Get the rate confirmed by your own broker against the actual CN code. Do not budget from a figure on a supplier’s website, this one included.
How to de-risk a first order
Verify the supplier exists
Ask for the GSTIN and the mill address and check they are consistent across the website, the invoice and the export documents. Ours is GSTIN 24ACMFA4862A1ZO at Anjali Textile Park-2, Kachhab, Surat 394540. Ask for a video call from the weaving floor - any real mill can do this on an hour’s notice.
Put the standard in writing
GSM tolerance, inspection threshold in points per 100 m², shade approval method and what happens to out-of-tolerance rolls. Agreed before production, these are routine; raised afterwards, they are a dispute.
Start smaller than you want to
A 10,000-metre trial costs more per metre in LCL freight but proves the construction, the shade and the supplier before you commit a container. Buyers who do this almost always place a larger second order; buyers who skip it sometimes do not place one at all.
Importing from India — buyer questions
What documents do I need to import fabric from India to the EU?
At minimum: commercial invoice, packing list, bill of lading, and certificate of origin. Depending on the fabric and your own compliance requirements you may also need REACH declarations of conformity, OEKO-TEX certification for the specific quality, and test reports for restricted substances. The mill prepares the export-side set; your customs broker files the import declaration at destination.
How long does shipping fabric from India to Europe take?
Allow roughly 22-35 days port to port from the Indian west coast to North European ports, depending on the carrier, routing and whether the service is direct or transhipped. Add production time before that and customs clearance after it. For planning purposes, a realistic door-to-door figure from order confirmation to goods in your warehouse is 8-12 weeks for a dyed and finished order, less for greige.
What is the import duty on woven fabric into the EU?
Duty on woven man-made fibre fabrics into the EU commonly falls in the region of 6.5 to 8 per cent, but the exact rate depends on the CN commodity code for your specific construction, and India's eligibility under the EU's GSP arrangements has changed over time. Get the rate confirmed by your own customs broker against the actual CN code before you budget - do not take a figure from a supplier's website, including this one.
Do I need to be VAT registered to import fabric?
In practice yes, if you are importing commercially into the EU. You will need an EORI number to clear goods, and import VAT is payable at clearance, usually recoverable through your normal VAT return if you are registered. Your customs broker or accountant will confirm the arrangements for your member state.
What is the minimum order quantity and does it fill a container?
Our minimum is 10,000 metres per quality. As a rough guide, a 20-foot container holds in the region of 40,000-60,000 metres of mid-weight fabric depending on construction and roll size, so a 10,000-metre order is an LCL (part container) shipment rather than a full one. LCL costs more per metre in freight, which is worth factoring into the comparison when you are deciding order size.
Can you ship to a European warehouse rather than a port?
We quote FOB and CIF to port. Delivery beyond the port - inland haulage to your warehouse - is normally arranged by your own forwarder, because they can combine it with your other inbound freight and clear customs at the same time. If you need a door-delivered price, say so at enquiry stage and we will tell you honestly whether we can arrange it competitively or whether you are better served by your own forwarder.
Have a specification in mind?
Send composition, target GSM, width and quantity and you will get a straight answer on whether our looms can carry it, with pricing against the actual construction.